There are five ASME codes that apply to the transportation of oil and gas by pipeline. ASME B31.4 covers the transportation of liquids such as crude oil and refined petroleum products. The standard also covers certain non-hydrocarbon liquids, namely anhydrous ammonia, carbon dioxide, and aqueous mineral slurries. This chapter discusses the 2019 Edition of B31.4. ASME B31.8 covers transmission and local distribution of natural gas. This chapter discusses the 2020 Edition of B31.8. ASME B31.8S is a supplement to B31.8 covering integrity management of natural gas transmission pipelines. This chapter discusses the 2020 Edition of B31.8S. B31G covers evaluation...

1.
U.S. Department of Transportation
,
Pipeline and Hazardous Materials Safety Administration
, www.phmsa.dot.gov/pipeline/library/data-statswww.phmsa.dot.gov/pipeline/library/data-stats.
2.
Shires
,
T.M.
and
Harrison
,
M.R.
, “
Development of the B31.8 Code and Federal Pipeline Safety Regulations: Implications for Today’s Natural Gas Pipeline System
”,
Gas Research Institute, GRI-98/0367.1
,
December
1998
.
3.
Kiefner
,
J.F.
and
Clark
,
E.B.
,
History of Line Pipe Manufacturing in North America
,
ASME CRTD
Vol.
43
,
1996
.
4.
American Petroleum Institute (API) Specification 5L
, “
Specification for Line Pipe
”.
5.
Kiefner
,
J.F.
,
“Evaluating the Stability of Manufacturing and Construction Defects in Natural Gas Pipelines”
,
US Dept. of Transportation, Office of Pipeline Safety
,
Contract No. DTFAAC05P01201
,
2007
.
6.
Duffy
,
A.R.
,
G.M.
McClure
W.A.
Maxey
and
T.J
Atterbury
. “
Study of Feasibility of Basing Natural Gas Pipeline Operating Pressure on Hydrostatic Test Pressure
”,
American Gas Association
,
Catalogue No. L30050
,
February
1968
.
7.
Markl
,
A.R.C.
, “
Piping Flexibility Analysis
”,
Paper 53-A-51
,
Transactions of ASME
,
1953
.
8.
API Recommended Practice (RP) 1102
, “
Steel Pipelines Crossing Railroads and Highways
”.
9.
Gresnigt
,
A.M.
, “
Plastic Design of Buried Steel Pipelines in Settlement Areas
”,
HERON
, Volume
31
, no
4
,
1986
.
10.
ASME B16.5
, “
Pipe Flanges and Flanged Fittings NPS ½ through NPS 24
”.
11.
ASME B16.9
, “
Factory-Made Wrought Buttwelding Fittings
”.
12.
ASME B16.34
, “
Valves – Flanged, Threaded and Welding End
”.
13.
ASME B16.47
, “
Large Diameter Steel Flanges
”,
2011
.
14.
ASME B16.49
, “
Factory-Made Wrought Steel Buttwelding Induction Bends for Transportation and Distribution Systems
”.
15.
Materials Standardization Society (MSS) SP-44
, “
Steel Pipeline Flanges
”.
16.
MSS SP-75
, “
Specifications for High Test Wrought Butt Welding Fittings
”.
17.
Rodabaugh
,
E.C.
, “
Review of Data on Mitre Joints in Piping to Establish Maximum Angularity for Fabrication of Girth Butt Welds
”,
WRC Bulletin
208
,
Aug
.
1975
.
18.
Rodabaugh
,
E.C.
,
Duffy
,
A.R.
, and
Atterbury
,
T.J.
, “
Fabricated Branch Connections in High Yield Strength Run Pipe
”,
A.G.A. NG-18 Report
No.
23
,
March
1970
.
19.
Rodabaugh
,
E.C.
, “
A Review of Area Replacement Rules for Pipe Connections in Pressure Vessels and Piping
”,
WRC Bulletin
335
,
August
1988
.
20.
API RP 1161
, “
Recommended Practice for Pipeline Operator Qualification (OQ)
”.
21.
API 1169
, “
Recommended Practice for Basic Inspection Requirements-New Pipeline Construction
”, 1st Ed.,
2013
.
22.
API RP 5L1
, “
Recommended Practice for Railroad Transportation of Line Pipe
”.
23.
API RP 5LW
, “
Recommended Practice for Transportation of Line Pipe on Barges and Marine Vessels
.
24.
API RP 5LT
, “
Recommended Practice for Truck Transportation of Line Pipe
”.
25.
Bruno
,
T.V.
, “
How to Prevent Transit Fatigue to Tubular Goods
,”
Pipe Line Ind.
,
July
1988
.
26.
ASME Boiler & Pressure Vessel Code (BPV), Section VIII
, “
Rules for the Construction of Pressure Vessels
”,
Division 1
.
27.
API Standard 1104
, “
Welding of Pipelines and Related Facilities
”.
28.
ASME BPV, Section IX
, “
Qualification Standard for Welding and Brazing Procedures, Welders, Brazers, and Welding and Brazing Operators
”.
29.
API Standard 650
, “
Welded Tanks for Oil Storage
”.
30.
API Recommended Practice 1160
, “
Managing System Integrity for Hazardous Liquid Pipelines
”.
31.
ANSI/API Recommended Practice 1173
, “
Pipeline Safety Management Systems
”.
32.
API Recommended Practice 1176
, “
Recommended Practice for the Assessment and Management of Cracking in Pipelines
”.
33.
Alexander
,
C.R.
, and
J.F
Kiefner
. “
Effects of Smooth and Rock Dents on Liquid Petroleum Pipelines
”,
API Publication 1156
,
November
1997
and
(Phase II) Addendum to API Publication 1156
,
October
1999
.
34.
Rosenfeld
,
M.J.
,
Hart
,
J.D.
, and
Zulfiqar
,
N.
, “
Development of Acceptance Criteria for Mild Ripples in Pipeline Field Bends
”,
Paper 02-27124
,
ASME International Pipeline Conference (IPC)
,
Calgary
,
2002
.
35.
API RP 2200
, “
Repairing Crude Oil, Liquefied Petroleum Gas, and Product Pipelines
”.
36.
API RP 2201
, “
Safe Hot Tapping Practices in the Petroleum & Petrochemical Industries
”.
37.
API RP 1111
, “
Design, Construction, Operation, and Maintenance of Offshore Hydrocarbon Pipelines (Limit State Design)
”.
38.
Kiefner
,
J.F.
,
Whitacre
,
G.R.
, and
Eiber
,
R.J.
, “
Further Studies of Two Methods for Repairing Defects in Line Pipe
”,
Final Report to the Pipeline Research Committee (PRC/PRCI) of the American Gas Association (AGA)
,
March
2
,
1978
.
39.
Kiefner
,
J.F.
,
Bruce
,
W.A.
, and
Stephens
,
D.R.
, “
Pipeline Repair Manual
”,
PRC, AGA Catalog No. L51716
,
December
31
,
1994
.
40.
Kiefner
,
J.F.
and
Alexander
,
C.R.
, “
Repair of Pipeline Dents Containing Minor Scratches
”,
PRC, AGA Catalog No. L51788
,
1999
.
41.
Bruce
,
W.A.
, “
Guidelines for Weld Deposition Repair on Pipelines
”,
PRCI, AGA Catalog No. L51782
,
1998
.
42.
National Association of Corrosion Engineers (NACE) Standard Practice SP0169
Control of External Corrosion on Underground or Submerged Metallic Piping Systems
”,
2007
.
43.
NACE SP0198
, “
Control of Corrosion Under Thermal Insulation and Fireproofing Materials—A Systems Approach
”.
44.
Det Norske Veritas (DNV), Standard OS-F-101
, “
Submarine Pipeline Systems
”.
45.
NACE Recommended Practice RP06-75
, “
Control of Corrosion on Offshore Steel Pipelines
”.
46.
Wallace
,
M.
,
Goudarzi
,
L.
,
Callahan
,
K.
, and
Wallace
,
R.
, “
A Review of the CO2 Pipeline Infrastructure in the U.S
.”,
DOE/NETL-2014-1681
,
April
21
,
2015
.
47.
Watt
,
J.
, “
Carbon Dioxide Transport Infrastructure Key Learning and Critical Issues
”,
Journal of Pipeline Engineering
, Vol.
9
, No.
4
,
2011
.
48.
Leis
,
B.N.
,
Saunders
,
J.H.
,
Clark
,
T.B.
, and
Zhu
,
X.-K.
, “
Transporting Anthropogenic CO2 in Contrast to Pipelines Supporting Early EOR
”,
Journal of Pipeline Engineering
, Vol.
9
, No.
4
,
2011
.
49.
DNV, Recommended Practice DNV RP J-202
, “
Design and Operation of CO2 Pipelines
”.
50.
ASME B31T
, “
Standard Toughness Requirements for Piping
.
51.
Jacobs
,
B.E.A.
,
Design of Slurry Transport Systems
,
Elsevier
,
1991
.
52.
Bergman
,
S.A.
, “
Why Not Higher Operating Pressures for Lines Tested to 90% SMYS?
”,
Pipeline and Gas Journal
,
December
,
1974
.
53.
Brooks
,
L.E.
, “
High-Pressure Testing – Pipeline Defect Behavior and Pressure Reversals
”,
ASME Transactions, 68-PET-24
,
1968
.
54.
Richie
,
D.A.
and
Rosenfeld
,
M.J.
, “
Investigation of Temperature Derating Factors for High-Strength Line Pipe
”,
ASME
STP-PT-049
,
2012
.
55.
Maxey
,
W.A.
, “
Fracture Propagation Studies
”,
Paper J, 6th Symposium on Line Pipe Research, AGA
,
1979
.
56.
Maxey
,
W.A.
, “
Fracture Initiation, Propagation, and Arrest
”,
Paper J, 5th Symposium on Line Pipe Research, AGA Catalog No. L30174
,
November
1974
.
57.
Maxey
,
W.A.
,
Kiefner
,
J.F.
, and
Eiber
,
R.J.
, “
Ductile Fracture Arrest in Gas Pipelines
”,
AGA Catalog No. L32176
,
December
,
1975
.
58.
Eiber
,
R.J.
,
Bubenik
,
T.A.
, and
Maxey
,
W.A.
, “
Fracture Control Technology for Natural Gas Pipelines
”,
PRCI, AGA Catalog No. L51691
,
December
1993
.
59.
Rosenfeld
,
M.J.
, “
A Simple Procedure for Synthesizing Charpy Impact Energy Transition Curves from Limited Test Data
”,
ASME 1st IPC
,
Calgary
,
1996
.
60.
API Specification 6D
, “
Specification for Pipeline Valves
”.
61.
American Society for Testing and Materials (ASTM) D2517
, “
Standard Specification for Reinforced Epoxy Resin Gas Pressure Pipe and Fittings
”.
62.
ASTM D2513
, “
Standard Specification for Thermoplastic Gas Pressure Pipe, Tubing, and Fittings
”.
63.
Eiber
,
R.J.
,
McGehee
,
W.B.
,
Hopkins
,
P.
,
Smith
,
T.
,
Diggory
,
I.
,
Goodfellow
,
G.
,
Baldwin
,
T.R.
, and
McHugh
,
D.R.
, “
Valve Spacing Basis for Gas Transmission Pipelines
”,
PR-249-9728
,
PRCI
,
January
2000
.
64.
API RP 1117
, “
Recommended Practice for Movement of In-Service Pipelines
”.
65.
Kiefner
,
J.F.
and
Maxey
,
W.A.
, “
The Benefits and Limitations of Hydrostatic Testing
”,
API
,
51st Annual Pipeline and Cybernetics Symposium
,
New Orleans
,
April
2000
.
66.
Rosenfeld
,
M.J.
, “
Proposed New Guidelines for ASME B31.8 on Assessment of Dents and Mechanical Damage
”,
Gas Technology Institute (GTI)
,
Topical Report GRI-01/0084
,
May
2001
.
67.
ANSI/NACE MR0175/ISO 15156
, “
Petroleum and Natural Gas Industries—Materials for Use in H2S-Containing Environments in Oil and Gas Production
”.
68.
Kiefner
,
J.F.
, and
Rosenfeld
,
M.J.
, “
Effects of Pressure Cycles on Gas Pipelines
”,
GTI
,
GRI-04/0178
,
September
17
,
2004
.
69.
Michael Baker Jr., Inc. and Kiefner & Associates, Inc.
, “
Spike Hydrostatic Test Evaluation
”,
Department of Transportation, Office of Pipeline Safety, Delivery Order DTRS56-02-D-70036, Technical Task Order (TTO)
Number
6
,
July
2004
.
70.
Rosenfeld
,
M.J.
, and
Kiefner
,
J.F.
, “
Basics of Metal Fatigue in Natural Gas Pipeline Systems – A Primer for Gas Pipeline Operators
”,
PR-302-03152-1
,
PRCI
,
September
30
,
2004
.
71.
Stephens
,
M.J.
, “
A Model for Sizing High Consequence Areas Associated with Natural Gas Pipelines
”,
GTI
,
Topical Report GRI-00/0189
,
October
2000
.
72.
NACE SP0502
, “
Pipeline External Corrosion Direct Assessment Methodology
”,
2010
.
73.
NACE SP0206
, “
Internal Corrosion Direct Assessment Methodology for Pipelines Carrying Normally Dry Natural Gas (DG-ICDA)
”.
74.
NACE RP0204
, “
Stress Corrosion Cracking (SCC) Direct Assessment Methodology
”.
75.
Kiefner
,
J.F.
, “
Criteria for Reinspection Intervals for Low-Stress Steel Pipelines
”,
GTI
,
Topical Report GRI-02/0060
,
2002
.
76.
API 579-1/ASME FFS-1
, “
Fitness for Service
”.
77.
Kiefner
,
J.F.
,
Maxey
,
W.A.
,
Eiber
,
R.J.
, and
Duffy
,
A.R.
, “
Failure Stress Levels of Flaws in Pressurized Cylinders
,
ASTM STP 536
,
1973
.
78.
Dugdale
,
D.S.
, “
Yielding of Steel Sheets Containing Slits
”,
Journal of the Mechanics and Physics of Solids
, Vol.
8
,
1960
.
79.
Folias
,
E.S.
, “
The Stresses in a Cylindrical Shell Containing an Axial Crack
”,
ARL 64-174
,
Aerospace Research Laboratories
,
October
1964
.
80.
Hahn
,
G.T.
,
Sarrate
,
M.
, and
Rosenfield
,
A.R.
,
International Journal of Fracture Mechanics
, Vol.
5
,
1969
.
81.
Maxey
,
W.A.
,
Kiefner
,
J.F.
,
Eiber
,
R.J.
, and
Duffy
,
A.R.
, “
Ductile Fracture Initiation, Propagation, and Arrest in Cylindrical Vessels
”,
ASTM STP 514
,
1972
.
82.
Kiefner
,
J.F.
, and
Vieth
,
P.H.
, “
A Modified Criterion for Evaluating the Remaining Strength of Corroded Pipe
”,
Project PR 3-805, AGA Catalog No. L 51609
,
December
22
,
1989
.
83.
Kiefner
,
J.F.
, and
Vieth
,
P.H.
, “
Evaluating Pipe – 1: New Method Corrects Criterion for Evaluating Corroded Pipe
”,
Oil & Gas Journal
,
Aug.
6
,
1990
, and “
Evaluating Pipe – Conclusion: “PC Program Speeds New Criterion for Evaluating Corroded Pipe
”,
Oil & Gas Journal
,
Aug.
20
,
1990
.
84.
Kiefner
,
J.F.
,
Vieth
,
P.H.
, and
Roytman
,
I.
, “
Continued Validation of RSTRENG
”,
Project PR 218-9304, AGA, Catalog No. L51749
,
December
20
,
1996
.
85.
Rosenfeld
,
M.J.
,
Vieth
,
P.H.
, and
Haupt
,
R.W.
, “
A Proposed Corrosion Assessment and In-Service Safety Factors for Process and Power Piping Facilities
”,
ASME Pressure Vessels & Piping Conference
,
Orlando
,
July 27–31
,
1997
,
PVP Vol. 353
.
86.
US DOT, PHMSA
, “
OQ Guide for Small Distribution Systems
”,
April
2004
.
87.
ASME B31J
, “Stress Intensification Factors (i-Factors), Flexibility Factors (k-Factors), and Their Determination for Metallic Piping Components”.
88.
MSS SP-97
, “Integrally Reinforced Forged Branch Outlet Fittings – Socket Welding, Threaded, and Buttwelding Ends”, SP-97.
89.
Zhang
,
S.
,
Yan
,
J.
,
Kariyawasam
,
S.
,
Huang
,
T.
, and
Al-Amin
,
M.
, “
Plausible Profile (Psqr) Corrosion Assessment Model: Refinement, Validation, and Operationalization
”,
ASME, IPC2020-9448
,
2020
.
90.
National Fire Protection Association (NFPA)
, “National Electrical Code”, NFPA-70.
You do not currently have access to this chapter.
Close Modal

or Create an Account

Close Modal
Close Modal