Decline curve analysis is the most commonly used technique to estimate reserves from historical production data for the evaluation of unconventional resources. Quantifying the uncertainty of reserve estimates is an important issue in decline curve analysis, particularly for unconventional resources since forecasting future performance is particularly difficult in the analysis of unconventional oil or gas wells. Probabilistic approaches are sometimes used to provide a distribution of reserve estimates with three confidence levels (P10, P50, and P90) and a corresponding 80% confidence interval to quantify uncertainties. Our investigation indicates that uncertainty is commonly underestimated in practice when using traditional statistical analyses. The challenge in probabilistic reserve estimation is not only how to appropriately characterize probabilistic properties of complex production data sets, but also how to determine and then improve the reliability of the uncertainty quantifications. In this paper, we present an advanced technique for the probabilistic quantification of reserve estimates using decline curve analysis. We examine the reliability of the uncertainty quantification of reserve estimates by analyzing actual oil and gas wells that have produced to near-abandonment conditions, and also show how uncertainty in reserve estimates changes with time as more data become available. We demonstrate that our method provides a more reliable probabilistic reserve estimation than other methods proposed in the literature. These results have important impacts on economic risk analysis and on reservoir management.

1.
Smith
,
P. J.
,
Hendry
,
D. J.
, and
Croether
,
A. R.
, 1993, “
The Quantification and Management of Uncertainty in Reserves
,”
Western Regional Meeting
, Anchorage, AK, May 26–28, SPE Paper No. 26056.
2.
Laherrere
,
J. H.
, 1995, “
Discussion of an Integrated Deterministic/Probabilistic Approach to Reserve Estimations
,”
JPT
0149-2136,
47
, pp.
1082
1083
.
3.
Patricelli
,
J. A.
, and
McMichael
,
C. L.
, 1995, “
An Integrated Deterministic/Probabilistic Approach to Reserve Estimations
,”
JPT
0149-2136,
47
, pp.
49
53
.
4.
Thompson
,
R. S.
, and
Wright
,
J. D.
, 1987, “
The Error in Estimating Reserves Using Decline Curves
,” SPE Paper No. 16295.
5.
Haskett
,
W. J.
, and
Brown
,
P. J.
, 2005, “
Evaluation of Unconventional Resource Plays
,” SPE Paper No. 96879.
6.
Etherington
,
J. R.
, and
McDonald
,
I. R.
, 2004, “
Is Bitumen a Reserve?
,” SPE Paper No. 90242.
7.
Cowgill
,
D. F.
,
Pitman
,
J. K.
, and
Seevers
,
D. O.
, 1981, “
NMR Determination Porosity and Permeability of Western Tight Gas Sands
,” SPE Paper No. 9875.
8.
Stabell
,
C.
, 2005, “
Integrated Risk, Resources and Value Assessment of Unconventional Petroleum Assets
,” SPE Paper No. 94667.
9.
Jochen
,
V. A.
, and
Spivey
,
J. P.
, 1996, “
Probabilistic Reserves Estimation Using Decline Curve Analysis With the Bootstrap Method
,” SPE Paper No. 36633.
10.
Cheng
,
Y.
,
Wang
,
Y.
,
McVay
,
D. A.
, and
Lee
,
W. J.
, 2005, “
Practical Application of a Probabilistic Approach to Estimate Reservoirs Using Production Decline Data
,” SPE Paper No. 95974.
11.
Fetkovich
,
M. J.
,
Fetkovich
,
E. J.
, and
Fetkovich
,
M. D.
, 1996, “
Useful Concepts for Decline-Curve Forecasting, Reserve Estimation and Analysis
,”
SPE Reservoir Eng.
0885-9248,
11
,
13
22
.
12.
Efron
,
B.
, and
Tibshirani
,
R. J.
, 1993,
An Introduction to the Bootstrap
,
Chapman and Hall
,
New York
.
13.
Capen
,
E. C.
, 1976, “
The Difficulty of Assessing Uncertainty
,”
JPT
0149-2136,
28
, pp.
843
850
.
14.
Nankervis
,
J. C.
, 2005, “
Computational Algorithms for Double Bootstrap Confidence Interval
,”
Comput. Stat. Data Anal.
,
49
, pp.
461
475
. 0167-9473
15.
Gidley
,
J. L.
,
Mutti
,
D. H.
,
Nierode
,
D. E.
,
Kehn
,
D. M.
, and
Muecke
,
T. W.
, 1979, “
Stimulation of Low-Permeability Gas Formations by Massive Hydraulic Fracturing: A Study of Well Performance
,”
JPT
0149-2136,
31
, pp.
525
531
.
You do not currently have access to this content.