Abstract

Increasing numbers of high-pressure high-temperature turbines are being subjected to frequent shutdowns, in many cases nightly. Designers and operators of these units must give careful consideration to the factors involved and by co-operative effort develop optimum techniques and procedures for starting and loading steam turbines. Suggestions are given in this paper of such procedures.

This content is only available via PDF.
You do not currently have access to this content.