One key characteristic of any process performance is variability; that is, a process rarely performs consistently over time. The bottleneck is one of the main reasons causing the system variability and fluctuation in production. Short-term production analysis and short-term bottleneck identification are imperative to enable manufacturing operations to optimally respond to dynamic changes in system behavior. However, conventional throughput and bottleneck analysis focus on long-term statistic bottleneck identification, which is usually not applicable to a short-term period. An on-line supervisory control method is introduced to search for short-term production constraints with unknown machine reliability distribution and mitigate those constraints to improve system throughput. The control mechanism uses playback simulation of the real production data to identify the bottleneck station, and control parameters of that station to reach a near balanced production line operation by understanding the bottleneck inertia phenomenon. The results ensure the smooth flow of products on the production line and increase the line’s performance.

1.
Koenigsberg
,
E.
, 1959, “
Production Lines and Internal Storage—A Review
,”
Manage. Sci.
0025-1909,
5
, pp.
410
433
.
2.
Buxey
,
G. M.
,
Slack
,
N. D.
, and
Wild
,
R.
, 1973, “
Production Flow Line Systems Design—A Review
,”
AIIE Trans.
0569-5554,
5
, pp.
37
48
.
3.
Buzacott
,
J. A.
, and
Hanifin
,
L. E.
, 1978, “
Models of Automatic Transfer Lines with Inventory Banks: A Review and Comparison
,”
AIIE Trans.
0569-5554,
10
, pp.
197
207
.
4.
Dallery
,
Y.
, and
Gershwin
,
S. B.
, 1992, “
Manufacturing Flow Line Systems: A Review of Models and Analytical Results
,”
Queueing Syst.
0257-0130,
12
, pp.
3
94
.
5.
Govil
,
M. C.
, and
Fu
,
M. C.
, 1999, “
Queueing Theory in Manufacturing: A Survey
,”
J. Manuf. Syst.
0278-6125,
18
, pp.
214
240
.
6.
Buzacott
,
J. A.
, and
Shanthikumar
,
J. G.
, 1993,
Stochastic Models of Manufacturing Systems
,
Prentice Hall
, Englewood Cliffs, NJ.
7.
Towill
,
D. R.
,
Evans
,
G. N.
, and
Cheema
,
P.
, 1997, “
Analysis and Design of an Adaptive Minimum Reasonable Inventory Control System
,”
Prod. Plan. Control
0953-7287,
8
(
6
), pp.
545
557
.
8.
Wiendahl
,
H.-P.
, and
Breithaupt
,
J.-W.
, 2000, “
Automatic Production Control Applying Control Theory
,”
Int. J. Prod. Econ.
0925-5273,
63
(
1
), pp.
33
46
.
9.
Duffie
,
N.
, and
Falu
,
I.
, 2002, “
Control-Theoretic Analysis of a Closed-Loop PPC system
,”
CIRP Ann.
0007-8506,
51
(
1
), pp.
379
382
.
10.
Ratering
,
A. M.
, and
Duffie
,
N. A.
, 2003, “
Design and Analysis of a Closed-Loop Single Workstation PPC System
,”
CIRP Ann.
0007-8506,
52
(
1
), pp.
355
358
.
11.
Ramakrishnan
,
S.
, and
Thakur
,
M.
, 2005, “
An SDS Modeling Approach for Simulation-based Control
,”
Proceedings of the 2005 Winter Simulation Conference
,
M. E.
Kuhl
,
N. M.
Steiger
,
F. B.
Armstrong
, and
J. A.
Joines
, eds.
12.
Kimemia
,
J. G.
, and
Gershwin
,
S. B.
, 1983, “
An Algorithm for the Computer Control of Production in Flexible Manufacturing Systems
,”
IIE Trans.
0740-817X,
15
(
4
), pp.
353
362
.
13.
Sethi
,
S. P.
,
Yan
,
H.
,
Zhang
,
H.
, and
Zhang
,
Q.
, 2002, “
Optimal and Hierarchical Controls in Dynamic Stochastic Manufacturing Systems: A Survey
,”
Manufacturing and Service Operations Management
,
4
(
2
), pp.
133
170
.
14.
Bai
,
S. X.
, and
Gershwin
,
S. B.
, 1995, “
Scheduling Manufacturing Systems With Work-in-Process Inventory Control: Single-Part-Type Systems
,”
IIE Trans.
0740-817X,
27
(
5
), pp.
599
617
.
15.
Anupindi
,
R.
, et al.
, 1999,
Managing Business Process Flows
,
Prentice Hall
, Englewood Cliffs, NJ, p.
199
.
16.
Chiang
,
S.-Y.
,
Kuo
,
C.-T.
, and
Meerkov
,
S. M.
, 2001, “
c-Bottlenecks in Serial Production Lines: Identification and Application
,”
Math. Probl. Eng.
1024-123X,
7
, pp.
543
578
.
17.
Kuo
,
C.-T.
,
Lim
,
J.-T.
, and
Meerkov
,
S. M.
, 1995, “
Bottlenecks in Serial Production Lines: A System-Theoretic Approach
,”
Math. Probl. Eng.
1024-123X,
2
, pp.
233
276
.
18.
Cassandras
,
C. G.
, and
Lafortune
,
S.
, 1999,
Introduction to Discrete Event Systems
,
Kluwer Academic
, Dordrecht, pp.
664
681
.
19.
Powell
,
G. S.
, 1994, “
Buffer Allocation in Unbalanced Three-Station Serial Lines
,”
Int. J. Prod. Res.
0020-7543,
32
(
9
), pp.
2201
2217
.
20.
Ma
,
Y.-H.
, and
Koren
,
Y.
, 2004, “
Operation of Manufacturing Systems With Work-in-Process Inventory and Production Control
,”
CIRP Ann.
0007-8506,
53
(
1
), pp.
361
365
.
21.
Powell
,
G. S.
, and
Pyke
,
F. D.
, 1996, “
Allocation of Buffers to Serial Production Lines with Bottlenecks
,”
IIE Trans.
0740-817X,
28
, pp.
18
29
.
22.
Chiadamrong
,
N.
, and
Limpasontipong
,
P.
, 2003, “
Using Storage Buffer to Improve Unbalanced Asynchronous Production Flow Line’s Performance
,”
Int. J. Manufacturing Technology and Management
,
5
(
1/2
), pp.
149
161
.
You do not currently have access to this content.