Under the current trend of globalization, companies develop products not only to target a single market but to sell them to the entire world. Companies realize the importance of collaborative design, or workshare, to develop global regional engineering centers to balance design variations while ensuring local market success. This paradigm shift enables diverse customer values to be integrated into products but also introduces challenges in the management of work distribution. Extensive industry case studies have shown that capability and capacity of the regional centers drive the workshare decisions; however, this strategy overlooks the interdependence of the design systems causing many delays and quality problems. Seeing the opportunity, this paper presents a method to identify and to quantify the system-level workshare risk based on the couplings of system components to evaluate the overall workshare scenarios. The risk analysis consists of two key elements in terms of two relationships, the division of work for distributions (i.e., component coupling) and the work assignments of the distributed teams (i.e., workshare coupling), as well as an algorithm to combine the relationships to calculate the workshare risk. To illustrate the steps of the risk analysis, this paper applies it to a hair dryer design as a case study. The paper also discusses the usages and characteristics of the risk analysis, and concludes with the future research and the next steps of generalizing the method to other product development projects.

2.
Leung
,
P.
,
Ishii
,
K.
,
Benson
,
J.
, and
Abell
,
J.
, 2005, “
Global Failure Modes and Effect Analysis: A Planning Tool for Global Product Development
,”
Proceedings of the ASME-IDETC (DETC2005-85117)
,
Long Beach, CA
.
3.
Karandikar
,
H.
, and
Nidamarthi
,
S.
, 2006, “
A Model for Managing the Transition to a Global Engineering Network Spanning Industrialized and Emerging Economies
,” Journal of Manufacturing Technology Management, to be published.
4.
Mar-Yohanna
,
M. J.
, 2001, “
Leading Engineering Teams in a Global Environment
,”
31st ASEE∕IEEE Frontiers in Education Conference
,
Reno, NV
.
5.
Vinaga
,
R.
, 2003, “
Major Challenges in Multi-Cultural Virtual Teams
,”
Proceedings of the Conference of the American Institute for Decision Sciences (Southwest Region)
,
Houston, TX
, pp.
341
346
.
7.
2003,
MS&E 252a—Risk Analysis Course Reader
,
E.
Pate-Co
,
Stanford University
,
Stanford, CA
.
8.
Whittemore
,
A.
, 1983, “
Facts and Values in Risk Analysis for Environment Toxicants
,”
Risk Anal.
0272-4332,
3
(
1
), pp.
23
33
.
9.
Maier
,
M.
, and
Rechtin
,
E.
, 2002,
The Art of Systems Architecturing
, 2nd ed.,
CRC
,
Boca Raton, FL
.
10.
Hertz
,
H.
, 1956,
Principles of Mechanics
,
Dover
,
New York
.
11.
Mori
,
T.
,
Ishii
,
K.
, and
Ohtomi
,
K.
, 1999, “
Task Planning for Product Development by Strategic Scheduling of Design Reviews
,”
Proceedings of the ASME-IDETC, (DETC1999-CIE9098)
,
Las Vegas, NV
.
12.
Eppinger
,
S.
, and
Cho
,
S.
, 2001, “
Product Development Process Modeling Using Advanced Simulation
,”
Proceedings of the ASME DETC (DETC2001∕DTM-21691)
,
Pittsburgh, PA
.
13.
Steward
,
D.
, 1981, “
The Design Structure System: A Method for Management the Design of Complex System
,”
IEEE Trans. Eng. Manage.
0018-9391,
EM-28
, pp.
71
74
.
14.
Eppinger
,
D.
,
Whitney
,
E.
,
Smith
,
R.
, and
Gebala
,
D.
, 1990, “
Organizing the Tasks in Complex Design Projects
,”
Proceedings of the ASME DTM
, Vol.
DE-27
, pp.
39
49
.
15.
Browning
,
T.
, 2001, “
Applying the Design Structure Matrix to System Decomposition and Integration Problems: A Review and New Directions
,”
IEEE Trans. Eng. Manage.
0018-9391,
48
(
3
), pp.
292
306
.
16.
Cohen
,
L.
, 1988, “
Quality Function Deployment: An Application Perspective from Digital Equipment Corporation
,” National Productivity Review, pp.
197
208
.
17.
2006,
ME317—Design for Manufacturability (DFM) Course Reader
,
K.
Ishii
, ed.,
Stanford University
,
Stanford, CA
.
18.
Shibata
,
H.
,
Cheldelin
,
B.
, and
Ishii
,
K.
, 2001, “
Assembly Quality Methodology: An Application of the Defect Prediction to Audio Equipment Assembled at Various Manufacturing Sites
,”
Proceedings of the ASME-DMC (DETC2001-21194)
,
Pittsburgh, PA
.
19.
Taylor
,
D.
, 1997, “
Design for Global Manufacturing and Assembly
,”
IIE Trans.
0740-817X,
29
(
7
), pp.
585
597
.
20.
Chen
,
Y.
,
Peng
,
Y.
,
Finin
,
T.
,
Labrou
,
Y.
,
Cost
,
S.
,
Chu
,
B.
,
Sun
,
R.
, and
Wilhelm
,
B.
, 1999, “
A Negotiation-Based Multi-Agent System for Supply Chain Management
,”
Third Conference on Autonomous Agents, Workshop on Agent based Decision-Support for Managing the Internet Enabled Supply-Chain
,
Seattle
.
21.
Lee
,
H.
, and
Billington
,
C.
, 1993, “
Material Management in Decentralized Supply Chains
,”
Oper. Res.
0030-364X,
41
(
5
), pp.
835
847
.
22.
Ragatz
,
G.
,
Handfield
,
R.
, et al.
, 1996, “
Success Factors for Integrating Suppliers into New Product Development
,”
Proceedings of the Annual Meeting of the Decision Sciences Institute
,
Decision Institute
,
Atlanta, GA
.
23.
Bevan
,
J.
, 1989, “
Co-Markership
,”
Manage. Decis.
0025-1747,
27
(
3
), pp.
50
54
.
24.
Esterman
,
M.
, and
Ishii
,
K.
, 2001, “
Concurrent Product Development Across the Supply Chain: Development of Supplier Risk and Coupling Indices
,”
Proceedings of the ASME Design for Manufacturing Conference (DETC2001–21192)
,
Pittsburg, PA
.
25.
Leung
,
P.
,
Ishii
,
K.
, and
Benson
,
J.
, 2006, “
Component Workshare Development Risk Analysis
,”
Proceedings of the ASME-IMECE (IMECE2006-14131)
,
Chicago, IL
.
26.
Sturges
,
R. H.
, and
Kilani
,
M.
, 1992, “
Towards an Integrated Design for an Assembly Evaluation and Reasoning System
,”
Comput.-Aided Des.
0010-4485,
24
(
2
), pp.
67
79
.
27.
Cargille
,
B.
, and
Bliss
,
R.
, 2001, “
How Supply Chain Analysis Enhances Product Design
,” Supply Chain Management Review, Sept.∕Oct., pp.
64
74
.
28.
Leung
,
P.
,
Ishii
,
K.
, and
Benson
,
J.
, 2005, “
Modularization of Work Task for Global Product Development
,”
Proceedings of the ASME-IMECE (IMECE2005-82137)
,
Long Beach, CA
.
29.
Leung
,
P.
,
Ishii
,
K.
,
Benson
,
J.
, and
Abell
,
J.
, 2006, “
System Engineering Workshare Risk Analysis
,”
Proceeding of the ASME-IDETC (DETC2006-99252)
,
Philadelphia, PA
.
30.
Little
,
A.
,
Wood
,
K.
, and
McAdam
,
D.
, 1997, “
Functional Analysis: A Fundamental Empirical Study for Reverse Engineering, Benchmarking, and Redesign
,”
Proceedings of the ASME-IDETC (DETC1997∕DTM-3879)
,
Sacramento, CA
.
You do not currently have access to this content.